The Project Manager window keeps track of the table files contained
in the current project as long as the thesaurus used as resources. Program
options are handled also at the project level, and can be changed using
Edit Project Options in menu
Project.

1. Project Manager Panels
The project manager has five tabs which point to four panels.
- Primary Table List : List of the table files associated to the
project as primary tables.
- Work Table List: List of the table files associated to the project
as work tables.
- Synoptic Table List: List of the table files associated to the project
as synoptic tables.
- Taxon Thesaurus Tree: Complete project taxon thesaurus. All taxon
thesaurus files are displayed toghether in a tree structure. Only
for visualisation purposes.
- Syntaxon Thesaurus Tree: Complete project syntaxon thesaurus. All
syntaxon thesaurus files are displayed toghether in a tree structure.
Only for visualisation purposes.
- Bibliography Thesaurus: Table of bibliographic thesaurus. Each row
is a bibliographic work.
2. Common Project Manager
Actions
2.1 Handling Table
Lists
Table Lists are mantained by using buttons Add/New/Edit/Clear from
Primary/Work/Synoptic table Lists (however,a new Synoptic Table cannot
be created by using New, it must be build from Work Tables).
To edit Releve tables, one can select the desired files and select Edit
button or right-click one file. This will open the appropiated editor
for that table type.
2.2 Table List Menu
Options in Table List menu are available for all table types:
- Lists can be ordered by file name, selecting Order by Name.
- Lists can be shown in text format ( "file" - "directory"
) by selecting Show List in Text.
2.3 Viewing Taxon
or Syntaxon Nodes
Taxonomy thesaurus and syntaxon thesaurus are displayed as trees in
Project Manager. Right clicking on a given taxon or syntaxon node makes
a dialog appear where the given node is detailed (in fact, by showing
a non editable Node Panel as would be used in Taxon or Syntaxon Editors).
This property can facilitate the inspection of thesaurus without having
to open the file in the editor.
2.4 Editing Project
Thesaurus
Although taxon thesaura files are displayed all toghether in the project
manager they cannot be edited toghether. When selecting Edit taxon
thesaurus option in menu Project a dialog may be displayed
to choose which file will be edited when more than one taxa or thesaurus
files are used in the project. After this choice, the taxon editors
will appear with the selected file ready to be edited. The same occurs
with or Edit bibliographic thesarus, which enables editing bibliography.
Edit syntaxon thesaurus options do not prompt any dialog because
just one thesaurus file is enabled in Quercus 1.2.
3. Primary Table Actions
3.1 Copying Primary
Tables to Work Tables
By selecting Copy From Primary to Work menu option one can clone
the currently selected primary table into a work table, which will be
stored using the file entered by the user.
3.2 Building new Work
Tables from Primary Selection
Work tables can be created automatically by parsing primary tables
looking for relevés fulfilling a specified condition. The currently
implemented selections can be made by choosing Create Work Table
Parsing By... menu in Primary Tables menu on the work manager:
- Relevés associated to a given syntaxon entity.
- Relevés containing a given taxon or taxon group.
- Relevés having a specified value in some side data (i.e.
UTM)
Those automatically created work tables are pasted in the Work
Table Editor.
3.3 Building Taxon
Reports from Primary Tables
Taxon reports are handled in another VegAna program, named FAGUS.
Primary Releve Tables can be exported to taxon citations in XML format
proper for FAGUS. See Table Listing to
see how to export taxon reports in another format.